EOI for Construction of an Earthquake-Resistant School Building

Peace Society Centre(PESOC) Nepal, Udayapur

Details / requirements:

Construction of an Earthquake-Resistant School Building 

Issued By: Peace Society Center (PESOC) Nepal

In Partnership With: dZi Foundation/Nepal

Location: Belaka Municipality, Udayapur District, Koshi Province.

Date of Publication: Sep 9, 2026

1. Background and Context

dZi Foundation is a US-based non-profit organization dedicated to working with rural communities in Nepal to achieve prosperity by removing barriers to basic needs, fostering sustainable livelihood opportunities, and enhancing local capacity to drive transformational change. Its current strategic plan emphasizes partnerships, local ownership, and long-term sustainability beyond external investments.

Under the direct strategic guidance and compliance direction of dZi Foundation/Nepal, the Local Implementing Partner NGO (LIPN), Peace Society Center (PESOC) Nepal, is implementing the project, Initiative for Shared Prosperity in Koshi River Basin in Nepal (ISPKN). This project integrates end-to-end design, procurement, and construction of one earthquake-resistant school building to increase children’s access to safe, accessible, and inclusive infrastructure and ensure their right to quality education.

The initiative utilizes an EPC (Engineering, Procurement, and Construction) framework through open competitive bidding. This model enforces single-point management accountability to guarantee strict compliance with engineering standards, procurement efficiency, environmental safeguards, and construction punctuality.

2. Project Overview & Specifications

Implementation Framework

  • EPC Model: The project utilizes an Engineering, Procurement, and Construction framework via open competitive bidding. 
  • Accountability: Single-point management accountability is enforced to guarantee compliance with engineering standards, procurement efficiency, environmental safeguards, and strict construction punctuality.

Target Beneficiaries:

  • Beneficiary School: Shree Shanti Adharhut Vidyalaya, Belaka -2, Shantinagar, Belaka Municipality, Udayapur District, Koshi Province. 
  • Beneficiary Students: The construction of this school building directly benefits a minimum of 47 children studying in this school.

Financial Co-Investment

Local Mobilization: The selected EPC contractor, in coordination with project steering entities, must mobilize a minimum of 25% of the total asset co-investment locally.

Site Specifications and Key Tasks

  • Site Location: Shree Shanti Adharhut Vidyalaya, Belaka -2, Shantinagar, Belaka Municipality, Udayapur District, Koshi Province.
  • SIP Support: Organize SIP development workshop engaging parents, SMC, Children and stakeholders to develop and finalize SIP of this school. 
  • Infrastructure Development: Design and construction of one earthquake-resistant school building/block with 2 classrooms total, including full furnishing and procurement of child-friendly furniture and seating arrangement materials. For details, please refer to section 4. Technical Scope of Work (EPC Pillars)
  • Community engagement and social mobilization: Conduct kick-off meeting at the school for project introduction and orientation, engaging community and school management committee (SMC) in project planning and decision-making, orient school on post-construction maintenance, conduct social audit and project handover.

3. Project Timeline & Payment Milestones

The total duration for the complete engineering, procurement, construction, and handover is projected to be a 6 to 9-month execution window from the date of contract signing. All payments are performance-based, requiring verified on-site structural validation and written municipal/SMC sign-offs before disbursements.

Milestone IDKey DeliverableTarget Schedule
M-01Inception report, engineering blueprints, local clearances and SIP development: Submission of finalized architectural/structural blueprints, designs, environmental impact mitigation plans, and signed municipal building permits and SIP of the schoolMonth 1
M-02Civil infrastructure mobilization & substructure completion: Completion of ground clearing, site grading, concrete foundation pouring, and structural framing.Month 4
M-03Child-friendly Furniture & Materials Delivery & local co-investment verification: Physical arrival of child-friendly furniture and materials at the site. Requires verification that at least 25% local co-investment funding has been formally committed and integrated into project books. Month 6
M-04Furnishing, Installation of furniture & materials and Orientation on Post-construction Maintenance: Fully furnished and complete installation of furniture and materials in the school building and verified completion of post-construction orientation to school management team.Month 8
M-05Social Audit & Handover: Successful completion of social audit and formal handover to school management committee. Month 9

4. Technical Scope of Work (EPC Pillars)

Phase 1: Engineering & Detailed Design

  • Inclusive Structural Design: Integrate child-friendly design elements directly into the architectural and structural blueprints, ensuring safety, accessibility, and age-appropriate use are embedded at the design stage.  
  • Environmental Safeguards: Develop a comprehensive waste-management and mitigation framework to responsibly handle construction and operational by-products such as construction debris, packaging materials, and site runoff in compliance with local environmental standards throughout the construction process.

Phase 2: Procurement Management

  • Child-friendly Furniture and Seating Arrangement Materials: Procure, deliver, and install child-friendly furniture and seating arrangement materials.

Phase 3: Construction, Furnishing and Handover

  • Civil Work: Execute all earthworks, foundation casting, interlocking bricks, false ceiling installation, CGI roofing, electrical wiring installation, ramp construction, windows and doors installation, plastering, painting etc. 
  • Furnishing and Handover: Fully furnish the building, conduct a social audit, and handover to the school management committee.

5. Bidder Evaluation Criteria

Bidding firms will be assessed based on a 100-point matrix broken down into the following weighted focus areas: 

  • Regional Experience in Nepal (25%): Track record of executing similar civil engineering and institutional/public infrastructure projects (e.g., schools, health posts, or community buildings) within the Eastern and Central regions of Nepal (e.g., Koshi, Madhesh, and Bagmati provinces), demonstrating a clear understanding of local terrain, logistics, and construction conditions (mid-hill and/or flatland, as applicable). 
  • Stakeholder Engagement & Collaboration Approach (25%): Proactive engagement methodologies working alongside the school community including students, teachers, and school management committees; interfacing with local municipal government (Palika) for permitting, land, and regulatory approvals; and coordinating with local suppliers and community labor where relevant.
  • Technical Approach & SOW Compliance (25%): Quality and feasibility of engineering designs, logical sequencing within the proposed 6–9 month fast-track schedule, and the robustness of integrated safety, accessibility, child-friendly, and environmental safeguard provisions.
  • Financial Capabilities & Local Co-investment Plan (25%): Financial viability and demonstrated liquidity of the firm to manage the project, alongside the credibility and transparency of the proposed mechanism to mobilize the minimum 25% local or community co-investment share.

6. Risk Management, Submission & Inquiries

Conflict Sensitivity & Grievance Redress

  • Labor Recruitment: The contractor must ensure absolute geographic, ethnic, and ward-level balance during local construction labor recruitment to prevent localized community friction. 
  • Grievance Mechanism: The contractor is required to set up an accessible, transparent, and anonymous grievance box and logging mechanism at the site on day one of mobilization to capture and immediately address complaints.

Submission Requirements

Interested Nepali companies/firms/organizations or Joint Ventures (JVs) of similar registered entities meeting the qualifications can submit their EOI containing: 

  1. A cover page. 
  2. A brief technical and financial proposal of not more than 10 pages. 
  3. Updated company profiles with the latest renewal and tax clearance certificates. 
  4. Evidence of at least 3 similar assignments. 

Contact, Deadlines & Logistics

  • Inquiries: Any questions or clarifications regarding this EOI should be directed to (pesocnepal@gmail.com) by Sep 13, 2026. The email must use the subject line: Inquiry for Belaka Municipality. 
  • Submission Deadline: Please submit your complete EOI by Sep 24, 2026, to (pesocnepal@gmail.com). The email must use the subject line: EOI for Belaka Municipality. 
  • File Size Constraint: Please ensure that the email attachment is not larger than 10 MB.

Please Note: Peace Society Center (PESOC) Nepal, under the compliance direction of dZi Foundation, may engage one or more firms to carry out the assignment and reserves the right to accept or reject any or all proposals without assigning any reason whatsoever.

Overview

Category Development Project, Expression of Interests, Tender Notice, Bid
Openings 1
Position Type Contract
Posted Date 09 Sep, 2026
Apply Before 24 Sep, 2026
City Udayapur