Call for Proposals: Solar System Installation in Parsa National Park

WWF Nepal

Details / requirements:

WWF Nepal invites proposals from qualified VAT-registered Nepal-based organizations to design, procure, install, test, and commission off-grid solar PV systems at four ranger posts in Parsa National Park- Mahadev, Bhata Hattisar, Bhata, and Shikaribas. The assignment aims to provide reliable and sustainable energy for essential services including lighting, communication, and power outlets, thereby strengthening the operational capacity and infrastructure of park staff. Each site will require a minimum 1.40 kWp solar PV array, 5.12 kWh battery storage, and 3.20 kW hybrid inverter, along with protection systems, internal electrical distribution, remote monitoring, and associated installation works.

Interested organizations are invited to submit their technical and financial proposals, along with required registration, VAT, and tax clearance documents, electronically to proposals-climate@wwfnepal.org with the subject line “Solar System Installation in Parsa National Park” by 14 September 2026.

Further details can be accessed through the ToR which can be downloaded here. 

https://www.wwfnepal.org/get_involved/call_for_proposals/ 

Only shortlisted candidates will be informed.

WWF is an Equal Opportunity Employer.

Please join us in our mission to save life on Earth.

Overview

Category
Salary Rs. /
Posted Date 03 Sep, 2026
Apply Before 14 Sep, 2026
City